Lot 1: Gaishaus and Alttann; Lot 2: Wolfegg; Lot 3: Rötenbach
Civil engineering and technical equipment
Gaishaus and AlttannLot 1: Gaishaus and Alttann
Route length (fixed and unpaved) approx. 3400 m
House connections approx. 680 m
House connections to the building approx. 103 pcs
POP Station approx. 1 pcs
Mains distributor approx. 3 pcs
Shafts approx. 7 pcs
Mikrorohrverbände ca. 4940 m
Subliner (3 x DA16 in DA50) approx. 750 m
Fiber optic cable approx. 37500 m
Splicing work and documentation
WolfeggLot 2: Wolfegg
Trassenlänge ca. 11700 m
House connections approx. 2500 m
House connections to the building approx. 236 pcs
POP Station approx. 1 pcs
Mains distributor approx. 6 pcs
Shafts approx. 19 pcs
Mikrorohrverbände ca. 31000 m
Fiber optic cable approx. 134600 m
Splicing work and documentation
RötenbachLot 3: Rötenbach
Route length (fixed and unpaved) approx. 4100 m
House connections approx. 540 m
House connections to the building approx. 59 pcs
Mains distributor approx. 5 pcs
Shafts approx. 6 pcs
Mirkrorohrverbände ca. 4360 m
Fiber optic cable approx. 31102 m
Splicing work and documentation