The dam school in Heilbronn, which was built around 1906, has to undergo a general renovation. The school building essentially corresponds to the original condition at that time. As part of the renovation, the deficient floor ceilings must largely be replaced and replaced with new concrete / sheet steel composite ceilings. In this course, urgently required measures are carried out on windows / facades, technical installations, room acoustics, etc. (renovation backlog). The current tender concerns the 2nd BA of general renovation. The 1st BA was carried out in 2018-2020.
Sanitary facilities according to DIN18381:
26 pieces of furnishings, 650 m drinking water pipe up to DN 50, 320 m waste water pipes up to DN 100, 3 pieces outside taps, 3 pieces hygiene flushing devices, 44 pieces dismantling facilities, 250 m dismantling drain pipes up to DN 100, 300 m dismantling galvanized pipes up to DN 50, 200 m Disassembly galvanized capacity up to DN 100, 3 pieces disassembly gas meter G65, G10, G6, 1 piece disassembly water distributor DN 100, filter, water meter.