Lot OS-17 floor layers work (§ 3 Abs. 9 VgV 80% contingent) - renovation of secondary school Am Merzdorfer Park - renovation of existing buildings, new building extension and. Connector and new building of sports hall and outdoor facilities school u. Gym:
1.1 Energetic renovation in the existing building and production of district heating connection (EFRE), renovation in the existing building (urban redevelopment), new building extension and connector (urban renovation).
PART S-ANBAU-SU:
- 1 955 m
- Clean 128 m steps and risers, fill all over,
- 28 m
- 1 157 m
- 1 191 m
- 10 m
- 498 m
- 1 000 m solid beech skirting,
- 262 m
- 110 m cove base rubber,
- 25 m rubber skirting with sealing lip,
- 150 m molded stairs rubber straight stairs,
- 320 pieces of rubber stair angles.
Part of ERDF:
- 230 m
- 929 m
- 196 m
- 60 m skirting board solid wood, stained oak,
- 500 m
- 533 m
- 2.3 m
- 311 m
- 537 m solid beech skirting,
- 196 m
- 118 m cove base rubber.
PART S-SAN-SU:
- 9 m
- 1 609 m
- 637 m
- 637 m
- 983 m
- 978 m solid beech skirting.