Between the AK Schkeuditz and the AS Halle (km 119 + 440 to 99 + 400), the BAB 9 in the direction of Berlin on a length of about 20 km to be fundamentally renewed.
For this purpose, the existing traffic system incl. Carriageway, drainage facilities and vehicle restraint systems must be dismantled. Subsequently, then the new construction of the traffic system. This includes the construction of the roadway in concrete construction, the production of the drainage systems as well as the construction of the vehicle restraint systems and the application of the markings. Furthermore, the road surface, sealing, FRS and the corrosion protection of the ÜKOs are to be renewed on 5 smaller A-structures.
According to the preliminary cost estimate, the construction costs amount to approx. EUR 40.8 million (gross).
The structural implementation should take place in the years 2021/22.
- Object planning of traffic systems (including equipment: in particular vehicle restraint systems, markings, signage, traffic routing during the construction period) Lph 1, Lph 3 (partial) and Lph 5 to 6 pursuant to § 47 HOAI i. V. m. Appendix 13, point 13.1,
- Design of civil engineering structures (including equipment, vehicle restraint systems) Lph 1 (partial), Lph 3 (partial), Lph 5 (partial) and Lph 6 (partial) according to § 43 HOAI i. V. m. Appendix 12, section 12.1,
- Special / additional services:
- Condition assessment and evaluation of the drainage systems,
- Surveying,
- Traffic management concept for the overall project including variant and cost comparison,
- additional services during execution.