The contract will be implemented on the basis of the decision to authorise the implementation of road investment No 4/2014 of 7.3.2014, mark: AR.6740.61.90.2013.JB61:
1) the starting point of the section was adopted before the junction with the Royal Street, and the terminus at the junction with Olbrachta Street in km 0+711.16; the width of the roadway: 6,00 m, the width of the pavement: the right side — 2,00 m, the left side — 1.50 m, the width of the bicycle path two-way: the left side 2.50 m;
2) construction of stormwater drains from PVC pipes fi 315-400 together with revision wells fi 1000 and sewage wells fi 500;
3) reconstruction and security of existing water supply networks and repair of the sanitary sewer section;
4) reconstruction of existing steel sections of medium pressure gas pipeline from PE 100 SDR 11 pipes;
5) reconstruction and security of NN and SN cable lines and NN overhead;
6) construction of street lighting;
7) reconstruction and security of teletechnical networks.
A detailed description of the subject of the contract is specified in:
1. design documentation;
2. technical specification for the performance and reception of construction works;
3. the proposed provisions of the public procurement contract together with the annexes;
Attachments to the specification are available in separate files.