New heat plant with 8 MW heat pump and 20 MW natural gas boiler. About and extension of existing engineering building.
Click here https://permalink.mercell.com/110050277.aspx
On behalf of the developer FFV Varme A / S, you are hereby invited to submit a total contract offer for a total contract, New heat plant at FFV Varme on L. Frandsensvej 1, Faaborg.
The total contract contains the following sub-tasks:
1) Extension and building modifications;
2) 8.0 MW electric-powered air-water heat pump;
3) 20 MW natural gas boiler incl. economizer;
4) Distribution connection with pumps and shunt;
5) Complete new SRO system.