Construction works of the Novi Ligure Interconnection - civil and line works and related works between pk 0+450 and pk 0+967.66, between pk 1+197.66 and pk 1+511.66 (Track Interconnection Even), between pk 0+254.44 and pk 0+548.44 and between pk 0+947.33 and pk 1+234.33 (Track odd interconnection) - Lot 1, as part of the construction of the HS/HC section "Terzo Valico dei Giovi"
Construction works of the Novi Ligure Interconnection - civil and line works and related works between pk 0+450 and pk 0+967.66, between pk 1+197.66 and pk 1+511.66 (Track Interconnection Even), between pk 0+254.44 and pk 0+548.44 and between pk 0+947.33 and pk 1+234.33 (Track odd interconnection) - Lot 1, as part of the construction works of the HS/HC section "Terzo Valico dei Giovi for a total amount based on the tender of EUR 34,529,548.49, excluding VAT, of which EUR 33,696,098.23 for tailor-made works and EUR 833,450.26 for security charges not subject to reduction divided into the following categories of works:
• Category OG4: € 18.662.007,51;
• Category OG3: € 7.551.800,14;
• Category OS21: € 5.987.980,54;
• Category OS8: € 2.327.760,30.