Construction project management services | Tenderlake

Construction project management services

Contract Value:
GBP 61K - 61K
Notice Type:
Contract award notice
Published Date:
28 December 2020
Closing Date:
Location(s):
UKH3 Essex (UK UNITED KINGDOM)
UKJ2 Surrey, East and West Sussex (UK UNITED KINGDOM)
UKJ3 Hampshire and Isle of Wight (UK UNITED KINGDOM)
UKJ4 Kent (UK UNITED KINGDOM)
Description:
Project Management SCF Projects

TKAT is centrally managing the SCF capital programme. The proposed capital projects have been divided into 10 Lots, to allow Tenderers to select particular projects they wish to tender for. TKAT continues to identify projects that can be bundled to reduce overall project costs. TKAT has decided where feasible, windows, roofing and boiler works type of projects will be bundled. TKAT seeks to award contracts to project management consultancies to manage the range of capital projects, comprising of ten lots, for the Trusts SCF 2020 and 2021 programme.


Broadfield Primary Academy — 300 m Running Track and Flood Lighting

Phase 1 only forming of 300 metre running track and flood lighting, to existing school playing field. Estimated value of the works is GBP 165 000.


Grays Farm Primary Academy Accessibility Works

Accessibility works — provision of internal and external ramps. Estimated value of the project works GBP 40 000.


2A: Chichester High School — Roof Renewal and 2B: Kemnal Technology College — Flat Roofing Works

Lot 2A: Chichesser High School — 3 smaller flat roofs to be renewed. Using a cold applied liquid membrane or a cold adhesive built up felt. Incl. uprated insulation. Estimated value of the works is GBP 138 000. Lot 2B: Kemnal Technology College — Flat roofing works to Harris Wing. Cold poured or cold adhesive applied built up felt system to be used. Incl. uprated insulation. Estimated value of the works is GBP 150 000.


Havant Academy — Window Replacement Works

Phase 1 only Window replacement works to 2 storey building used for extended schools/nursery/small group learning. Single elevation to be completed as part of a phased rolling programme. Estimated value of the project works is GBP 100 000


Hylands School Water Supply and Distribution Alterations

Phase 1 only Water supply and distribution alterations to control legionella risks, including asbestos removal works and removal of wet convector heater in SEAC building. Estimated value of the works GBP 30 000.


Ore Village Primary Academy — Relocate Fire Escape Route

Relocation of the fire escape route from current location outside the school gates on public land onto the playing field to the rear of the school site. Estimated value of the project works GBP 50 000.


Rainham School for Girls — Sixth form Block Extension with Two Phases

Phase 1 6th Form Block extension. Preliminary structural investigations/working up designs/planning application/tendering project — up to and including appointment of contractor and maybe mobilisation to site setup. Estimated value of phase 1 of the project works GBP 100 000. Phase 2 Construction phase of the project with a target completion for occupation of September 2021. Estimated value of phase 2 of the project works GBP 450 000


Stapleford Abbotts Primary Academy Toilet Block Extension

Toilet block extension, front entrance remodelling and work to extend front car park. Also lagging of heating pipework, minor fencing alteration, hard surface marking and provision of 2 small canopies. Estimated value of the project works GBP 125 000.


TKAT Centre Refurbishment of Science and Data Room Areas

Refurbishment of science room and data room areas for office expansion and archive area. Estimated value of the project works GBP 55 000.


The Oaks Primary School Various Works

Various, including integrating Nursery by corridor to main school, refurbishment and fire safety works. Estimated value of the project works GBP 67 000.

Awarded to:
Broadfield Primary Academy — 300 m Running Track and Flood Lighting
AMR Consult Ltd, London (UK)
Grays Farm Primary School Accessibility Works
AMR Consult Ltd, London (UK)
Havant Academy Window Replacement Works
AMR Consult Ltd, London (UK)
2A Chichester High School Roof Renewal and 2B Kemnal Technology College — Flat Roofing Works
AMR Consult Ltd, London (UK)
Hylands School Water Supply and Distribution Alterations
AMR Consult Ltd, London (UK)
Ore Village Primary School Relocation of Fire Escape Route
AMR Consult Ltd, London (UK)
Rainham School for Girls 6th Form Block Extension
AMR Consult Ltd, London (UK)
Stapleford Abbots Primary Academy Toilet Block Extension, Front entrance remodelling and extend front Carpark
AMR Consult Ltd, London (UK)
TKAT Centre Refurbishment of Science Room and Data Rooms
AMR Consult Ltd, London (UK)
The Oaks Primary Various Works
AMR Consult Ltd, London (UK)
Broadfield Primary Academy — 300 m Running Track and Flood Lighting
Carre Consultancy Ltd, Faversham (UK)
Grays Farm Primary School Accessibility Works
Carre Consultancy Ltd, Faversham (UK)
Havant Academy Window Replacement Works
Carre Consultancy Ltd, Faversham (UK)
2A Chichester High School Roof Renewal and 2B Kemnal Technology College — Flat Roofing Works
Carre Consultancy Ltd, Faversham (UK)
Hylands School Water Supply and Distribution Alterations
Carre Consultancy Ltd, Faversham (UK)
Ore Village Primary School Relocation of Fire Escape Route
Carre Consultancy Ltd, Faversham (UK)
Rainham School for Girls 6th Form Block Extension
Carre Consultancy Ltd, Faversham (UK)
Stapleford Abbots Primary Academy Toilet Block Extension, Front entrance remodelling and extend front Carpark
Carre Consultancy Ltd, Faversham (UK)
TKAT Centre Refurbishment of Science Room and Data Rooms
Carre Consultancy Ltd, Faversham (UK)
The Oaks Primary Various Works
Carre Consultancy Ltd, Faversham (UK)
Broadfield Primary Academy — 300 m Running Track and Flood Lighting
Stace LLP, Epping (UK)
Grays Farm Primary School Accessibility Works
Stace LLP, Epping (UK)
Havant Academy Window Replacement Works
Stace LLP, Epping (UK)
2A Chichester High School Roof Renewal and 2B Kemnal Technology College — Flat Roofing Works
Stace LLP, Epping (UK)
Hylands School Water Supply and Distribution Alterations
Stace LLP, Epping (UK)
Ore Village Primary School Relocation of Fire Escape Route
Stace LLP, Epping (UK)
Rainham School for Girls 6th Form Block Extension
Stace LLP, Epping (UK)
Stapleford Abbots Primary Academy Toilet Block Extension, Front entrance remodelling and extend front Carpark
Stace LLP, Epping (UK)
TKAT Centre Refurbishment of Science Room and Data Rooms
Stace LLP, Epping (UK)
The Oaks Primary Various Works
Stace LLP, Epping (UK)
Download full details as .pdf
The Buyer:
The Kemnal Academies Trust
CPV Code(s):
71541000 - Construction project management services