Partial new construction of the Eckartsberga primary school, planning services - Lot 5: Technical equipment planning Plant group 1-3 (HLS)
Partial new construction of the Eckartsberga primary school, planning services - Lot 5: Technical equipment planning Plant group 1-3 (HLS)
-The present object is a contiguous
Building complex used by a day-care centre and a primary school
becomes. The building consists of 3 different building parts, which approx.
between 1940 and 1975.
The measure described here includes the partial new construction of the middle
Part of the building, which was used by the primary school. The new building
Part is to be rebuilt almost analogously to the old stock. The net
Usable area is approx. 1,500 m² on 3 above-ground floors. The Old Man
Part of the building should actually be renovated. Due to various static problems
It was ultimately decided to demolish and build a partial new building. During
of the construction measures, the day-care centre and part of the primary school will remain in operation.
In preparation for the renovation, concrete plans have already been drawn up. After
the new building is now to be built. To do this, everything has to be done again.
be reviewed and revised. Due to the new building, the building loses the
Grandfathering and must be adapted to new guidelines.