Lot 10 tile work.
Tile work is to be carried out by the contractor:
Preparatory work: cleaning, closing shrinkage joints and cracks, finely filling the screed, preparing the floor and wall with a deep primer
Sealing: Bonded sealing on the floor and wall, approx. 630 m
Sealing: Wall / floor and wall / wall connections, approx. 920 m, tub edge sealing tape, approx. 310 m
Tiles in the stairwell:
Floor tiles, porcelain stoneware, unglazed, 30/60, approx. 480 m
Tiles in the apartments: floor tiles, porcelain stoneware, unglazed, 30/30, approx. 340 m
Partition rail, corner protection bracket
Other: making recesses, silicone joints, mirrors.