On the basis of IT SiG, the University Hospital Leipzig is upgrading the infrastructure of the data network on the entire Liebigstraße campus. The existing fiber data network is expanded, equipped with decentralized 1 GB miniSwitches and executed redundantly to ensure the necessary availability. The power supply of the miniswitche is used as the central
Reinstalled the UPS power supply. At the same time, the existing WLAN supply will be extended to full availability in terms of area. All work takes place in stock, for the most part under conditions of use and in compliance with hospital-specific hygiene.
The University Hospital Leipzig intends to upgrade and expand the infrastructure of the data network on the entire campus on Liebigstraße. Construction work will take place in parallel in several buildings, levels and rooms. The new fiber optic cables to be laid must be equipped and measured with new connectors. The new power lines to be routed from the cable duct switch to the floor distribution cabinets and must be put into operation on new fuses and power supplies. For the installation of the new cable duct switches, a certificate of competence for the brands of Microsens and Nexans must be provided.
The following services are to be performed:
—Primary Scope:
Fiber Optic — Cable Singlemode (approx. 2 000 m across all buildings)
Patch panels OS2 and associated patch cords (approx. 10 pieces across all buildings)
Fiber Optic — Cable Multimode (approx. 1,500 m across all buildings)
Patch panels OM4 and associated patch cords (approx. 5 pieces across all buildings)
— Secondary range:
Fiber Optic — Cable Multimode (approx. 30,000 m across all buildings)
Splice distributor (approx. 130 pieces across all buildings)
Patch panels OM4 and associated patch cords (approx. 300 pieces across all buildings)
— Tertiary education:
Laying cables/wires over suspended ceilings (approx. 15 000 m across all buildings)
Fiber Optic — Breakout Cable OM4 (approx. 80,000 m across all buildings)
LC plug incl. field mounting (approx. 4,500 pcs across all buildings)
Installation of cable-channel switches with all necessary accessories (approx. 3,400 pieces above all buildings)
— WLAN:
Installation WLAN - AccessPoints with all necessary accessories (approx. 120 pieces across all buildings)
Installation of data cable Kat6A (approx. 15 000 m over a part of the buildings)
— Distribution cabinets:
Supply and installation of distribution cabinets of various sizes and all necessary accessories (about 30 pcs above all buildings).