project management contract for the energy renovation works of the Judicial Court of Narbonne. The objective of the project is to achieve the recommendations of the DEET in terms of energy performance of the building while ensuring normal conditions of activity for occupants, particularly in summer comfort. Thus, the mission of MOE, subject of this consultation, includes a diag tce, an acoustic study, a mission of basic MOE (including Cssi) and an OPC mission. (see program sheet on the PLACE platform for more details)
the missions entrusted to the project management team are as follows, in accordance with the elements defined in Articles R.2431-1 to R.2431-23 of the CCP: - aPS, preliminary summary draft- aPD, detailed preliminary design including administrative authorizations- pRO-DCE, Project / Business Consultation File, - aCT, Assistance Works Contracts, - vISA, Examination of conformity to the project and approval of execution studies carried out by contractors, - dET, Direction de l'exécution des contrats de Travaux,- aOR, Assistance to acceptance operations, and the following additional missions: - dIA, diagnosis: the mission will aim to verify the feasibility of implementing the recommended solutions on the technical, structural and architectural aspects and confirm their relevance. It will be possible to propose alternative solutions.- the acoustic study will aim to comply with the legislation and minimize the noise impact of the installations and will include the realization of measurements before and after the works, the drafting of calculation notes, modelling, etc.- OPC, Scheduling Steering and Coordination: in addition to the organization of the works, their phasing, etc., the OPC mission will have to integrate the constraints of the site in operation in order to reduce nuisance for the occupants and continuity of public service, security and safety... Clarifications on the basic mission: The basic mission integrates the obligations relating to the management of Construction Site Waste within the meaning of Articles L541-1 to L541-50 and L542-1 to L542-14 of the Environmental Code and its implementing texts. It also incorporates the obligations relating to the Coordination of Fire Safety Systems (CSSI) within the meaning of the NFS 61932 standard. As such, the project management team performs the function of ISS coordinator