The Contracting Authority shall establish a new nursery school with 12 stations in the Bjerke neighbourhood.
Currently there are two older buildings on the sight that have been owned by The Norwegian Civil Defence, as well as a temporary nursery school. The Contracting Authority will be responsible for the removal of the temporary nursery school.
Contractor/tenderer shall be responsible for the demolition of the existing buildings down to the cellar level and construction of a new nursery school with associated outdoor areas.
The new nursery school consists of approximately 2,000 m2 of new buildings plus the existing cellars. The project has high environmental ambitions and is a FutureBuilt's model projects. The nursery school shall be constructed as a plus house (produces more energy than it consumes) and shall also achieve a BREEAM-NOR certificate (version 2012) level — Excellent. Oslo kommune's standard requirement specification in 2015 for nursery schools is the basis for the project and the nursery school is designed and shall be built in accordance with TEK10.
Turnkey contract or general contract.
The demolition works shall be carried out at a fixed price. Until issuing of the tender documentation, the Developer retains the right to regulated as a turnkey contract in accordance with NS 8407 or as a general contract in accordance with NS 8405. An environmental clearance description has been prepared, and will be enclosed with the tender documentation.
General Contract:
Construction of a new nursery school with outdoor area shall be executed as an ordinary general contracted based on NS 8405. An NS 3420 description, as well as completive annex and drawings shall be sent out together with the tender documentation.
The Developer must give tender offer on the entire project, i.s. Both the demolition and construction work, and not only submit tender offers on 1 of the lots.