Construction work for highways, roads | Tenderlake

Construction work for highways, roads

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 December 2021
Closing Date:
27 January 2022
Location(s):
DE4 BRANDENBURG (DE Germany/DEUTSCHLAND)
DE408 Havelland (DE Germany/DEUTSCHLAND)
Description:
B1 FS + RW Plaue - Neubensdorf, FL Road Construction

B1 FS Plaue - Neubensdorf, FL road construction

B1 RW Plaue - Neubensdorf, FL Road Construction

approx. 2,330 m² cleared forest area

approx. 299 pcs of rootstocks

produce approx. 182 pieces of protection for tree trunk

approx. 55,600 m² asphalt surface layers pick up road surface

absorb approx. 39,750 m² asphalt binder layer

absorb approx. 41,100 m² asphalt base layer

Pick up approx. 13,000 m² of pitch mounting

Absorb approx. 5,900 m² base layer without binder

Absorb approx. 200 m² base layer with hydraulic binder

Pick up approx. 3,250 m² of paving ceiling

Pick up curbs approx. 2,150 m

Remove approx. 75 m drainage line with shafts

approx. 200 m dismantle the protective device

approx. 136 hours dismantle traffic sign/pipe post

approx. 320 st dismantle guide posts

produce approx. 11,000 m of banquet

Manufacture approx. 950 m of trough including seep

Restore a trough profile of approx. 2,900 m

remove approx. 9,800 m³ of topsoil and partially reuse

Apply approx. 36,300 m² of topsoil

approx. 3,650 m³ replacement of rooted soil

Remove and remove approx. 3,000 m³ of soil

deliver and install approx. 4,750 m³ of soil

Lay approx. 6,100 m² of geotextile of various types

approx. 16,200 m² hydraulically bound soil strengthening

approx. 18,300 m² of gravel base layer in various thicknesses

Set shelves approx. 3,770 m

produce approx. 470 m of strips of natural stone paving

approx. 1,670 m² asphalt surface layer

approx. 50,950 m² asphalt base layer

approx. 39,450 m² asphalt binder layer*

approx. 48,600 m² grit mastic asphalt

approx. 1,660 m² mastic asphalt

approx. 2,820 m² of paving work including tactile elements

approx. 11,250 m² asphalt surface layer

approx. 120 m² semi-rigid top layer

approx. 15 workflows with connecting cable

approx. 230 m concrete/plastic pipeline with shafts

produce a lying seepage layer of approx. 540 m³

Install approx. 1,260 m root protection film

Install approx. 2,050 m of empty pipe

approx. 60 m steel railings

approx. 2 passenger shelter

approx. 36,500 m² lawn seeding

approx. 17,700 m road marking (colour)

Download full details as .pdf
The Buyer:
Landesbetrieb Straßenwesen Brandenburg Dienststätte Potsdam
CPV Code(s):
45233100 - Construction work for highways, roads