Road construction in paved and unpaved areas with different surface material.
Ladestraße:
- 8,820 m
- 5 460 m
- 2 930 m
- 1 350 m
- 1 140 m pipeline for rainwater drainage DN 800 to DN 300 incl. Required shafts and groundwater lowering,
- 185 m SW cable DN 300 incl. Required shafts,
- rebuild 1 water meter shaft,
- 9 000 m
- 900 m
- install 2 600 m concrete curb,
- install 830 m natural stone shelf,
- 3 150 m
- 705 m
- build 2 bus stops on the roadside,
- Install 500 m steel mesh fence including 3 gates,
- 900 m
- P & R.
Dismantling pavement area:
- 125 m rainwater pipe DN 300 incl. Required shafts,
- 1 100 m
- 1 760 m