The existing building is being completely renovated. The new community hall is arranged on the upper floor over two floors.
The library will be installed on the ground floor and basement level. The exterior walls of the building are built on the eaves and gables up to
Blanket removed over 1st floor. The best roof truss as well as the wooden beam ceilings above the 2nd floor, 1st floor and ground floor will be completely expanded.
A new reinforced concrete floor will be installed via the basement, ground floor and upper floor in some areas. The outer walls are reinforced concrete columns from EG
stiffened to the roof. There is a new building in the basement. Spaces for music associations are being created on the east side. Toilet facilities and shooting ranges with ancillary rooms are arranged in the north. In the west, all ventilation and heating technology is installed.
EC: In the north-west, rooms are planned for the adult education center. The development is via the south side with
Information entrance hall. An information hall is planned in the south-east. Upper floor: On the north side, side rooms, changing rooms and cloakrooms are planned for the hall.
Core quantities:
1 x textile fire protection finish
EW90-SA-C2 size approx. 555 cm/270 cm
1 x textile fire protection finish
EW90-SA-C2 size approx. 465cm/270c