Structural work.
- Excavation excavation approximately 25,000 m
- Sheet pile shoring approx. 3,200 m
- buoyancy anchor L = 15 m approx. 88 pieces,
- Reinforced concrete sedimentation basin C 35/45 approx. 4000 m
- Reinforced concrete shafts C 35/45 approx. 150 m
- reinforcing steel BSt 500 approx. 500 t,
- channels PE DN 1000 - 1 400 mm approx. 120 m,
- channels V4A DN 600 mm approx. 30 m,
- Road construction approx. 250 m