Cham-Hünenberg bypass (UCH) Hauptlos Ost

Construction of the Städtlerwald tunnel including associated ancillary structures (safety tunnels, control centres, pumping stations, stacking basins, retaining walls) and opencast mines, route between the Stumpen pre-zone and the Teuflibach junction (incl. tunnel), replacement of the motorway feeder road, reconstruction of the Alpenblick junction, corridor path and surrounding work.

- Kalotten-/Strossenvortrieb MUF (TSM)

- Tunnel length 540 m, mining 400 m

- Cross-sectional area tunnel: 100 m2

- Safety tunnel 15 m2, length 180 m

Construction of the Städtlerwald tunnel including associated ancillary structures (safety tunnels, control centres, pumping stations, stacking basins, retaining walls) and opencast mines, route between the Stumpen pre-zone and the Teuflibach junction (incl. tunnel), replacement of the motorway feeder road, reconstruction of the Alpenblick junction, corridor path and surrounding work.

- Kalotten-/Strossenvortrieb MUF (TSM)

- Tunnel length 540 m, mining 400 m

- Cross-sectional area tunnel: 100 m2

- Safety tunnel 15 m2, length 180 m