Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 May 2013
Closing Date:
03 July 2013
Location(s):
NO NORGE (NO Norway/NORGE)
Description:

The new Ålgård church

A new and modern church is planned for Ålgård. The church building constitutes of two floors totalling 1 550 m2 and is planned as a signature building for the city centre and shall accommodate diverse activities.

The congregation is therefore working with a possible extension of the basement with approx. 400 m2 for children and youth activities. The framework has been ordered and their shall be given price options for the future establishment of the expansion.

The building plot situation: The church shall be built on a plot next to the old church in Ålgård city centre. The plot is against the churchyard.

The excavation work is scheduled to start in the summer of 2013 with the completion of the church building within 2014.

Norconsult is engaged as the site manager. The works are to be implemented by builder controlled contracts.

Expected division of contracts (i.e. approx. 15 contracts)

1. Site labourer

2. Outdoor facilities

3. Concrete and steel works

4. Laminated wood construction (incl. supplier pre fabrication)

5. Timber works, facade / skylights, tinsmith works, interior tile work

6. Roofing works

7. Painting and floor and wall coverings

8. Sanitation works, hydronic heating / heating pump

9. Ventilation works

10. Electrical works – heavy current, lighting, Electrical works – low current

11. automatization, central control facility

12. Sound system

13. Stage lighting system

14. Furniture for the sanctuary

15. Lift

Laminated wood works:

The laminated wood construction forms a rigid slab on the ceiling. The construction consists of heavy main beams, which are associated with secondary, diagonally placed beams. All the connections between the beams and the casting points are planned to be non-visible and placed in slots in the beams. All of the connecting means must be immersed and hidden with wooden plugs. This is for both architectural considerations and fire prevention measures: visible steel is unwanted because of architectural considerations. Also for fire prevention measures are non-visible connection elements are easier: The laminated wood protects the steel from heat if it is deep enough within the laminated wood.

NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=294826.

Download full details as .pdf
The Buyer:
Gjesdal kirkelige Fellesråd
CPV Code(s):
03410000 - Wood
03419000 - Timber
44212240 - Girders
44220000 - Builders' joinery
45000000 - Construction work