Drinking-water treatment plant construction work | Tenderlake

Drinking-water treatment plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 January 2024
Closing Date:
16 February 2024
Location(s):
FRY3 Guyane (FR FRANCE)
Description:
Deployment of a freshwater production system on Île Royale (Kourou - French Guiana) with a production capacity of 30 m3 per day of fresh water, meeting regulations and requirements for drinking water, energy efficiency, and compatibility with equatorial and saline climate.
Deployment of a freshwater production system on Ile Royale (Kourou - French Guiana)

CNES's need is to set up a freshwater production system on Île Royale (Kourou – French Guiana) for a production capacity of 30 m3 per day of fresh water on the island.

with a potable water option.

CNES's need is to set up a freshwater production system on Île Royale (Kourou – French Guiana) for a production capacity of 30 m3 per day of fresh water on the island.

with a potable water option.

The system set up must consume as little energy as possible in terms of electricity consumption.

It will have to comply with all applicable regulations in this area on the type of equipment selected, for drinking water, have official accreditations, and meet the requirements of the

Architects of the Buildings of France.

The equipment used must be compatible with an equatorial and saline climate.

The system should be as simple and "standard" as possible in terms of operation and maintenance.

Download full details as .pdf
The Buyer:
CNES
CPV Code(s):
45252126 - Drinking-water treatment plant construction work