Sanitary work New construction of the Lenggries nursing home consisting of raw installation of drinking water and waste water, installation of the installation blocks in the drywall pre-walls, partly in the construction of the building. Thermal insulation of pipes and finishing installation.
Sewage pipes DN50-DN150 – approx. 1250 m
Insulation 9mm hose – approx. 800 m
Gully with fire protection insert and attachment – approx. 60 pcs
Stainless steel pipeline DN12-DN40 – approx. 1600 m
Thermal insulation mineral wool of risers – approx. 500 m
Metallverbundrohr DN12-DN20 – ca. 1000 m
Washbasin barrier-free – approx. 85 pcs
WC barrier-free – approx. 19 hours
Toilet without flush rim – approx. 75 pcs
Surface-mounted thermostatic shower mixer – approx. 80 pcs
WC-Stützklappgriff – ca. 100 St