operation Rn88 - development with 2x2 lanes - bypass of Baraqueville - rest area of Baraqueville Assistance mission to project management for the realization of studies and the follow-up of works relating to networks (excluding rainwater network), public lighting, equipment and various developments
the project management assistance mission is an engineering mission for the realization of studies and the monitoring of works relating to the networks (excluding rainwater network), public lighting, equipment and various developments, of the rest area of Baraqueville, as part of the operation of development to 2x2 lanes of the bypass of Baraqueville on the RN88.
The contract has a firm tranche and 2 optional tranches:
- firm tranche - assistance to project management for the realization of partial and global development studies (phases 1 and 2) of the rest area as well as for the establishment of the ELD(s) Works, the follow-up and acceptance of partial development works (phase 1) relating to networks (excluding rainwater network), public lighting, equipment and various developments;
- optional tranche No. 1 - Assistance to project management for the realization of the ELD Works as well as the follow-up and acceptance of the overall development works (phase 2) of the rest area relating to the networks (excluding rainwater network), public lighting, equipment and various developments;
- Optional tranche No. 2 - Assistance to project management for the realization of studies and the monitoring of the works, relating to the installation of shades or photovoltaic panels as part of the overall development of the rest area (phase 2).