1. The object of the order is: “Installation of photovoltaic cells on buildings of schools and other facilities owned by the Municipality of Rypin”.
Description of the procurement:
3. The object of the order is the delivery and installation of 11 pcs of photovoltaic installations in the area
the municipality of Rypin and the town of Rypin (Municipality Office building), comprising, inter alia:
1) supply and assembly of 11 pcs of photovoltaic installations with a total peak power of 323.38 kWp, according to
The following table:
Lp. Locality No. Plot of Hoop Size min. Installation (kWp)
1st Sadłowo 23 284/6, 272/2, 273/2 Sadłowo 19,98
2nd Borzymin 5 90 Borzymin 24.42
3. Borzymin 14 73/1 and 73/3 Borzymin 48,84
4. Kowalki 29 40/1, 40/2 Kowalki 22.20
5th Government Old Man 13 76, 57/3 Starpin Private/Government Old Man 16.28
6th Kowalki 62B 81 Kowalki 47.36
7th Sadłowo 8A 285/4, 285/9, 284/6 Sadłowo 37.00
8th Kowalki 29 40/1, 40/2 Kowalki 25.16
9. Old man Private Part 1 72/6, 72/27, 72/28 Starpin Private 25.16
10. Old man Private II Part 72/6, 72/27, 72/28 Starpin Private 23.68
11. Rypin, Lipnowska Street 4 332/3 Rypin 33,30
TOTAL 323.38
2) installation of support structures of photovoltaic modules,
3) installation of photovoltaic panels on the structure,
4) installation of solar wiring between modules and inverter,
5) making the main installation for connecting the inverter to the main switchboard of the building,
6) installation of RDC DC switchgear,
7) installation of the inverter,
8) installation of RAC switchgear switchgear switchgear unit,
9) the performance of anti-shock protection,
10) the performance of surge protection,
11) trials, measurements, adjustment and technological start-up of the plant,
12) execution of abbreviated post-built documentation for each project participant and full documentation
non-construction for the Contracting Authority (certificates, guarantees, instructions for use, executive projects, set
3/6
electrical measurements, a set of documents to change the meter, documentation received from the Ordering Party
with red-colored corrections applied),
13) connection to the PGE Distribution S.A. network with the preparation of a set of documents and
confirmation of the application of the installation to the network - a scan of accepted applications for the network,
14) training Users in the proper operation of the installations performed,
15) drawing up service instructions containing the necessary information on how to proceed
in case of unexpected errors in the installation,
16) Programming and commissioning of the installation,
17) replenishment of possible cavities of walls, ceilings, sealing of roofing material after passages
wires,
18) other elements included in the technical specification provided with the design documentation (Annex No 8
to SWZ);
4. The Ordering Party in the case of a difference of 1 mm in the width and height parameters of the PV modules
consider the parameter condition to be met according to the design (converting the area of modules per m2),
considering the above-mentioned discrepancy as negligible deviation.