The Joint Community of Zeven writes below the award of the structural design acc.
§§ 49 ff. HOAI for the aforementioned project within the framework of a Europe-wide procurement procedure on the basis of the Public Procurement Ordinance (VgV).
The Joint Community of Zeven is planning on the property Klostergang 4 in the immediate vicinity of the city centre
von Zeven the conversion of a former primary school in a listed ensemble into a
Kultur- und Bildungszentrum Zeven (KuBiZ). The stock, which was previously used as a primary school, consists of
consisting of a historic brick building and a wing built in the mid-1950s. The buildings
are located in a historically valuable environment and are to be considered accordingly from the point of view of monument conservation.
The heating system is operated via a combined heat and power plant in the basement of the building, which will be retained.
debit. Directly adjacent to the square area in front of the school is the St. Viti Church and the
adjoining former monastery, which today houses a museum. The listed former
Prison, now used as a kindergarten, closes off the forecourt of the former school to the north.
The planning of an energy-optimized building concept is expected, taking into account the above
described circumstances.
The newly emerging KuBiZ will house a library and premises for the adult education centre
and also provide an area for culture, museum and archives. The existing buildings are available under
Consideration of the grandfathering (ensemble protection) to renovate energetically.
For the commissioning of the object planning, an implementation competition was carried out in accordance with RPW 2013
and the assignment from this procedure. The
essential plans, views, floor plans, sections, etc. are attached to the tender documents. Regarding further
Details will be provided on the tender documents from January, which are also attached to the tender documents.
2021.