Architectural, engineering and planning services | Tenderlake

Architectural, engineering and planning services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 November 2023
Closing Date:
21 December 2023
Location(s):
DEA24 Leverkusen, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
2023-0233 General planning services (architectural and specialist planner services) Work phases 1-9 for the new construction of the forest school including sports hall in timber construction, GGS Waldschule, Carl-Maria-von-Weber-Platz, 51375 Leverkusen

General planning services (architect and specialist planner) for the new construction of the forest school including sports hall in timber construction, GGS Waldschule, Carl-Maria-von-Weber-Platz, 51375 Leverkusen

General planning services for the new construction of the forest school including the sports hall in timber construction, The new building is to be built with a static system in timber construction or in panel construction. In doing so, the project planner should work out the extent to which the use of the wood material makes sense. The scope of services of the general planner includes the services of the following specialist planners:

- Object planning for buildings (service phases LPH 1-8 according to HOAI 2021);

- Structural design (LPH 1-6 according to HOAI 2021);

- Object planning for pollutant/demolition/dismantling work (LPH 1-8 according to HOAI 2021);

- Technical building equipment (TGA) - MEP specialist planning, plant groups 410-480 & engineering structures 550 (LPH 1-9 according to HOAI 2021)

- Fire protection planning (LPH 1-8 according to AHO 2015);

- Building physics: room acoustics, sound insulation, thermal insulation and energy balancing, moisture protection (LPH 1-7 according to HOAI 2021)

- Necessary civil engineering planning.

In particular, all planning services must include timber construction planning - a special technical consideration of the requirements of timber construction. In addition, the object of the property planning also includes the necessary civil engineering planning.

Furthermore, comprehensive general planning services must be provided at each stage of the service, in particular:

- Organization of the Planungsprozesses;

-Consultation;

- Reporting/documentation/IT;

- Coordination and management of the project.

A planning and monitoring service must be provided under coordination and control with regard to planning and monitoring, which covers the entire measure, including specialist planning, and assumes all necessary tasks,

in order to achieve the client's project goal: construction of a new building

a primary school including a sports hall in timber construction, taking into account structural,

economic and educational aspects.

A planning and monitoring service must be provided under coordination and control with regard to planning and supervision, which covers the entire measure, including specialist planning, and assumes all necessary tasks in order to achieve the client's project goal: Construction of a new primary school including a sports hall in timber construction, taking into account constructional, economic and school pedagogical aspects.

It is planned to dismantle the existing building fabric on the site and to build a new compact school building in timber construction with a directly adjoining sports hall in the area of the demolished school structure (service provided by the general planner). In order to investigate the feasibility and economic viability of the project, a feasibility study was commissioned in advance. This includes a detailed spatial plan, which is to be used as the basis for a design. Since teaching cannot be possible during the construction phase, it is planned to outsource the students during the construction work. It should be taken into account that no separate outsourcing of the sports hall should be necessary.

There are numerous trees in the schoolyard that enjoy special protection due to their size and age. In the past, a harmful soil change was suspected on the area. As part of a new building, the areas must be re-examined and re-evaluated.

The new building is to achieve an energy value of KfW Efficiency House 40 or KfW Efficiency House 40 plus.

If necessary, the implementation can be carried out. by a general contractor, in which work phases 5-8 are reduced accordingly.

The assignment takes place in stages:

Stage 1: LPh 1-2 including the development of an energy concept for all building services trades for the entire property.

Stage 2: LPh 3 subject to the planning decision of the relevant political bodies and the allocation of funds

Stage 3: LPh 4-9 Implementation of the measure according to the schedule, taking into account the constraints of school operations, subject to the approval of the political bodies and the provision of funds.

Download full details as .pdf
The Buyer:
Stadt Leverkusen - Fachbereich Recht und Vergabestelle
CPV Code(s):
45214210 - Primary school construction work
71240000 - Architectural, engineering and planning services