Changing rooms & partitions.
- Technical processing, work planning;
- construction site equipment;
- sampling;
- approx. 8 shower walls;
- approx. 4 partitions WCs
- approx. 2 collective changing rooms with sliding doors;
- Individual changing as a block (individual changing);
- approx. 10 individual changing rooms as a block (individual changing rooms);
- 4 collective changing rooms / partitions with 2 changing cabins each;
- 438 pieces of HPL cabinets (300 * 500 mm); some with 2 compartments, some with handicapped cabinets;
- approx. 28 security compartments as a block;
- approx. 20 helmet compartments as a block;
- approx. 40 security compartments as a block;
- 2 storage shelves;
- approx. 12 hairdressing systems, some with mirrors;
- 1 pc HPL changing table shelf;
- HPL media box;
- approx. 38 pieces of HPL storage board in the showers;
- 2 foldable changing tables;
- approx. 440 hangers;
- Milled cabinet numbers on cabinet head sides;
- approx. 526 cupboard numbers, plate with engraving;
- coat hooks;
- single hook;
- headboards of the lockers;
- various cutouts for TGA;
- various passport covers.