The purpose of this consultation is the complete replacement of the air treatment facilities in the basin hall, the creation of domestic hot water production with primary storage, the replacement of filtration pumps, the automation of filter backwashes, the installation of a CTM.
The technical rooms for air treatment, water treatment and energy production are currently located in the basement of the building. The ventilation networks run through the ceiling of the technical rooms and circulations and then into the technical gallery under the pool
complete replacement of the air treatment facilities in the basin hall, the creation of a domestic hot water production with primary storage, the replacement of filtration pumps, the automation of filter backwashes, the installation of a GTC.
The technical rooms for air treatment, water treatment and energy production are currently located in the basement of the building. The ventilation networks run through the ceiling of the technical rooms and circulations and then into the technical gallery under the pool