By contract, the Supplier undertakes, in accordance with the provisions of the Agreement and the requirements of the applicable legal acts, to carry out design engineering geological and geotechnical surveys and to prepare a report and carry out preliminary ecogeological studies (soil contamination studies) and prepare a report and prepare a report and prepare a report with technical task No T-44 approved by the Buyer on 07.03.2023.
By contract, the Supplier undertakes, in accordance with the provisions of the Agreement and the requirements of the applicable legal acts, to carry out design engineering geological and geotechnical surveys and to prepare a report and carry out preliminary ecogeological studies (soil contamination studies) and prepare a report and prepare a report and prepare a report with technical task No T-44 approved by the Buyer on 07.03.2023.