Neubua LKA Asservatenlager and KMBD interim storage Biesenthal, shell work
Structural work.
- 6 200 m 3 excavation,
- 2 350 m 3 Disposal of excavated earth,
- 700 m 2 Masonry in different Dimensions, types, strengths,
- 1 000 m 3 Floor slabs reinforced concrete, different thicknesses,
- 200 m 3 Strip and single foundations,
- 1 700 m 3 situ concrete walls,
- 700 m 3 concrete ceilings,
- 440 t of concrete and reinforcing steel,
- 7 500 m 2 Wall and ceiling plaster in different ways,
- 5 000 m 2 Surface and exterior wall seals,
- 250 m 2 Drywall ceilings,
- 4 850 m 2 Scaffolding.