Engineering design services | Tenderlake

Engineering design services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
14 March 2023
Closing Date:
17 April 2023
Location(s):
PL POLSKA (PL Poland/POLSKA)
Description:
Development of design documentation for the task entitled: "Wrocław gas pipeline - Northern bypass - liquidation of 3 shallows: in the Topór River, in the Dobra River and in the drainage ditch in the town of Wrocław. Malin"

1.The subject of the Order is the development of design documentation for the task entitled: "Gas pipeline Wrocław - Northern bypass - liquidation of 3 shallows: in the river Topór, in the river Dobra and in the drainage ditch in the town of Malin".

2. A detailed description of the subject of the Order contains Attachments No. 1 to SWZ — model contract.

1.The subject of the Order is the development of design documentation for the task entitled: "Gas pipeline Wrocław - Northern bypass - liquidation of 3 shallows: in the river Topór, in the river Dobra and in the drainage ditch in the town of Malin".

2. A detailed description of the subject of the Order contains Attachments No. 1 to SWZ — model contract.

3. CPV code number of the subject of the Order:

-71242000-6 Preparation of project and project, cost estimation,

-71248000-8 Design and documentation supervision,

-71320000-7 Design engineering services.

4.The Contracting Authority informs that trademarks, patents or origin, sources or a specific process that characterizes products or services provided by a specific contractor, used in the content of the Specification and Annexes to the Specification, which are not accompanied by the words "or equivalent" together with an indication of the criteria used to assess equivalence, are only illustrative and serve to facilitate the preparation of tenders by Contractors.

5.Where the content of the Specifications and Annexes to the Specification contains a reference to standards, technical assessments, technical specifications and technical reference systems referred to in Article 101 paragraph 1 point 2 and paragraph 3 of the Act, the Contracting Authority allows solutions equivalent to those described, and such reference is accompanied by the words "or equivalent". The Contractor offering equivalent solutions is obliged to prove in the offer on the terms set out in the "Offer" Form (Annex 6 to the SWZ) that the proposed solutions meet the requirements specified in the description of the subject of the Order to an equivalent extent.

6.The Contractor is obliged to read and apply the recommendations resulting from the Code of Conduct for Suppliers of the Gas Transmission Operator GAZ-SYSTEM S.A. (Code of Conduct for Suppliers of the Gas Transmission Operator GAZ-SYSTEM S.A. is available on the Ordering Party's website: http://www.gaz-system.pl/przetargi/kodeks-postepowania-dla-dostawcow/).

7. The Contractor is obliged to read and apply the "Tenderer's (Contractor/Supplier's) Handbook", available on the Procurement Portal in the "Regulations and instructions" tab.

8.The Contracting Authority allows for the possibility of making a site inspection by the Contractors, no later than 3 days before the deadline for submitting tenders. In such a situation, the Contractor is obliged, at least 2 days before the proposed date of the on-site inspection, to apply by means of electronic communication within the meaning of the Act of 18 July 2002 on the provision of electronic services (i.e. Journal of Laws of 2020, item 344; hereinafter referred to as the "Act on the provision of electronic services") to the Contracting Authority with a request to set the date (day and time) of the on-site inspection, subject to reservation, that the on-site inspection may take place from Monday to Friday, excluding public holidays, from 9:00 a.m. to 2:00 p.m. The Contracting Authority allows the Contractor to obtain in this way all additional information that may be necessary for the preparation of the offer and the conclusion of the contract and performance of the Order. The on-site inspection is not a meeting of the Contractors referred to in Article 136 of the Act; therefore, during the on-site inspection, the Contracting Authority will not accept questions to clarify the content of the SWZ, nor will it answer the Contractors' questions. The costs of participation in the on-site inspection at the facility covered by the subject of the Order shall be borne by the Contractor.

9.The design documentation shall not indicate trademarks, patents or the origin, sources or specific process that characterizes the products or services provided by a specific contractor, if this could lead to the preference or elimination of certain contractors or products, unless it is justified by the specificity of the subject of the contract and the designer cannot describe the subject of the contract with sufficiently precise terms, The indication must then be accompanied by the words 'or equivalent' and the conditions for this equivalence must be described (indication of the characteristic parameters required to satisfy equivalence).

10.The Ordering Party is entitled to exercise the option right during the term of the Agreement, to the extent described in the Model Agreement (Annex No. 1 to the SWZ). The right of option is a right of the Ordering Party that may or may not be exercised as part of the performance of the Agreement. If the Ordering Party does not exercise the option right, the Contractor shall not be entitled to any claims in this respect.

Depending on its needs, the Contracting Authority will be entitled to exercise, under the terms specified in the Model Agreement, the right of option to order the Contractor during the term of the Agreement, additional orders involving the fulfilment of copyright supervision.

A condition for the activation of the option right is for the Contracting Contractor to submit an application of an order of actions concerning the execution of the Order under the right of option.

Download full details as .pdf
The Buyer:
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A., ul. Mszczonowska 4, 02-337 Warszawa, w imieniu którego postępowanie prowadzi Oddział we Wrocławiu
CPV Code(s):
71242000 - Project and design preparation, estimation of costs
71248000 - Supervision of project and documentation
71320000 - Engineering design services