The overall project involves the renovation and extension of a three-field sports hall. The renovation concerns the roof surfaces, the façade surfaces and the interior fittings. In the course of the expansion, a single-storey extension will be built on the east side. On the south side, after the demolition of the old building, a new foyer area is being built for the main development of the three-field sports hall. The technical renovation concerns the heating, ventilation and sanitary facilities as well as the entire electrical engineering.
- 130 m² floor tiles
- 265 m² wall tiles
- 25 m interior window sills made of natural stone
- 180 m² Refurbish existing natural stone flooring
- 150 m² floor covering made of natural stone incl. skirting boards
- 50 m natural stone – stair covering incl. skirting boards
- 200 pcs. replacement of individual acoustic bricks
- 160 m demolition and new installation of vertical row acoustic bricks