Fundamental renewal of the BAB A 6 roadway and renovation work on bridge structures
Asphalt area picking up approximately 30,400
Concrete roadway including HGT take up approx. 21,600 m2
HGT take up under asphalt approx. 9,200 m2
Taking up old concrete roadway underground approx. 12,000 m2
absorb layer without binder approx. 13,500 m3
Installation plan balancing approx. 7,000 m3
Qualified soil improvement approx. 3,800 m2
Geogrid stabilized base system approx. 3,800 m2
Frost protection layer approx. 48,200 m2
Asphalt top/mastic asphalt approx. 54,000 m2
Making road drains approx. 100 pcs
curb work approx. 2,400 m
Making street drainage bays approx. 100 pcs
Banquet work approx. 4,800 m3
Channel renewal including shafts approx. 3,500 m
Construction repair (underguide structure) 3 pcs
(building area approx. 2,000 m2)
Construction repair (transfer structure) 2 pcs
(renovation soffit)