- Execution planning including road planning
- Conversion of the existing bridge for motorized traffic
- Temporary bridge for pedestrians
- Coordination of line reinstallation work
- demolition of superstructures and substructures
- Handling harmful substances
- installation
- Reconstruction and construction of the bank sheet pile wall in the bridge area
- New construction of the bridge, 2 substructures
- Dismantling of the temporary bridge for pedestrians after the 1st construction phase
- Creation of inventory records
- pipeline rework (water, district heating, gas, electricity, communication lines), including civil engineering
WNA Berlin is planning to replace the new Marggraff Bridge, which consists of three partial bridges. It will be replaced by a two-part new building. At the same time, the bank pile wall in the bridge area is being renewed.
Shipping and road traffic must be maintained during the construction project. In the construction phase, one of the three sub-bridges will be upgraded for road traffic. As there are several lines from different line operators within the construction field, it is necessary to lay them in advance of the bridge construction work. This requires traffic safety services that have to be adapted several times to the progress of construction.
Services to be performed:
Relocation of pipelines (water, district heating, gas, electricity, communication lines), including civil engineering
bridge construction
Technical processing (among others):
- Provide execution planning including static calculation (building aid, demolition and new construction)
- Deliver technical planning (traffic facilities)
- Create road signs and marking plans
- Deliver inventory documents and drawings
- Record building data, create building book
- Deliver a measurement program for the engineering survey of the building
- Coordination of pension providers
Make a temporary bridge for pedestrians, including pipe pile foundation, span above water 48 m
Demolition of existing structure: demolition of steel/prestressed concrete approx. 2,700 m³
Excavation pit construction (shoring beams with infill) approx. 1,300 m²
Anchoring for shoring In/remove excavation pit approx. 1,200 m
excavation pit including disposal (approx. 500 m³ Z2) approx. 7,400 m³
New road bridge:
Produce cast-in-situ piles approx. 800 m³
Disposal of drillings >Z2 from cast-in-place pile drilling approx. 800 m³
Reinforced concrete work substructures and superstructures approx. 2,200 m³
Precast reinforced concrete slabs overbuilding approx. 160 m³
hollow steel boxes superstructures approx. 600 t
Produce asphalt approx. 3,000 m²
Bank sheet pile wall replacement approx. 1,000 m²