floorlaying work. The subject of this call for proposals is the construction of a two-storey school building with a cafeteria and conversion work in the existing building.
Flooring work: Lay approx. 2,800 m² of flooring including substrate preparation, install approx. 20,000 m of skirting boards,
approx. 75 pcs Coat stair treads with linoleum, including surface pretreatment, lay approx. 435 m² upranted lamella parquet.