Limited provision of framework agreements on artisan services for VIA University College.
Campus Aarhus - EL works, including strong current, weakflow and IT cablingThe descriptions below constitute the task content of the respective fields where contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on contracting entities.
The primary task content in this subject area is expected to be as follows:
- Troubleshooting, repairing and replacing existing power installations
- Repair of outdoor lighting
- Moving electricity installations
- Miscellaneous board repairs
- Repair and replacement of fixtures
- Establishment of new installations
- Sockets
- Headboards
- Relays
- Lighting
- Grounding (establishing, inter alia, ground spears)
- Cable lines for strong current, weakflow and IT
- Work takes place indoors and outdoors
- The electrician must be able to make energy calcu
- IT installations, including cabling and terminating copper and fibre connections
- Acute assignments and sentry calls.
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Holstebro - plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Holstebro - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Repair and service after storm and water damage
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Holstebro— Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Horsens - EL works, including strong current, weakflow and IT cablingThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Troubleshooting, repairing and replacing existing power installations
•Repair of outdoor lighting
•Moving power installations
•Miscellaneous board repairs
•Repair and replacement of fixtures
•Establishing new installations
•Sockets
•Headboards
•Relays
•Lighting
•Grounding (establishing, inter alia, ground spears)
•Strong current, weakflow and IT cable launches
•Work takes place indoors and outdoors
•The electrician must be able to make energy calcu
•IT installations including cabling and termination of copper and fibre connections
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Horsens, Plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Horsens - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
•Repair and service after storm and water damage
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Horsens — Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Expected number of Suppliers on the Framework Agreement
Campus Randers - EL works including strong current, weakflow and IT cablingThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Troubleshooting, repairing and replacing existing power installations
•Repair of outdoor lighting
•Moving power installations
•Miscellaneous board repairs
•Repair and replacement of fixtures
•Establishing new installations
•Sockets
•Headboards
•Relays
•Lighting
•Grounding (establishing, inter alia, ground spears)
•Strong current, weakflow and IT cable launches
•Work takes place indoors and outdoors
•The electrician must be able to make energy calcu
•IT installations including cabling and termination of copper and fibre connections
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Randers - Plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Randers - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
•Repair and service after storm and water damage
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Aarhus - plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Randers — Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Silkeborg - EL works, including strong current, weakflow and IT cablingThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Troubleshooting, repairing and replacing existing power installations
•Repair of outdoor lighting
•Moving power installations
•Miscellaneous board repairs
•Repair and replacement of fixtures
•Establishing new installations
•Sockets
•Headboards
•Relays
•Lighting
•Grounding (establishing, inter alia, ground spears)
•Strong current, weakflow and IT cable launches
•Work takes place indoors and outdoors
•The electrician must be able to make energy calcu
•IT installations including cabling and termination of copper and fibre connections
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Silkeborg - plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Silkeborg - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
•Repair and service after storm and water damage
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Silkeborg — Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Viborg - EL works, including strong current, weakcurrent and IT cablingThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Troubleshooting, repairing and replacing existing power installations
•Repair of outdoor lighting
•Moving power installations
•Miscellaneous board repairs
•Repair and replacement of fixtures
•Establishing new installations
•Sockets
•Headboards
•Relays
•Lighting
•Grounding (establishing, inter alia, ground spears)
•Strong current, weakflow and IT cable launches
•Work takes place indoors and outdoors
•The electrician must be able to make energy calcu
•IT installations including cabling and termination of copper and fibre connections
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Viborg - plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Viborg - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
•Repair and service after storm and water damage
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Viborg — Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Aarhus - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Repair and service after storm and water damage
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
•Repair and service after storm and water damage
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Aarhus — Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Herning - EL works, including strong current, weakflow and IT cablingThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Troubleshooting, repairing and replacing existing power installations
•Repair of outdoor lighting
•Moving power installations
•Miscellaneous board repairs
•Repair and replacement of fixtures
•Establishing new installations
•Sockets
•Headboards
•Relays
•Lighting
•Grounding (establishing, inter alia, ground spears)
•Strong current, weakflow and IT cable launches
•Work takes place indoors and outdoors
•The electrician must be able to make energy calcu
•IT installations including cabling and termination of copper and fibre connections
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Herning - plumbing, including technical insulation and plumberThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of the content of tasks under this subject area is expected to be as follows:
•Repair and replacement of toilets, mixing batteries and other sanitation
•Troubleshooting, adjustment and regulation of heating systems
•Cleansing and deacidification of exchanger and hot water containers
•Troubleshooting and repairing leaks
•Repair after frostbite
•Miscellaneous works on use-water installations
•Overhaul and repair of pump wells
•Floor drains and fallstrains
•24-hour calls for urgent tasks
•Gutters — Repair and Replacement
•Repair of slate roof
•Coverage — Troubleshooting and repair
•Scootering repair
•Replacement of radiators
•Replacement of pumps (circulation pumps and drain pumps)
•Replacement of fallstrains
•Replacement of seed-through pipes (used water and heat)
•Replacement of faulty drop strains
•Replacement of Used Water Installations (Pipeline)
•Replacement of heating system installations (piping)
•Replacement of expansion container/water heater in heat central
•Technical insulation around plumbing installations and ventilation pipes
•Work with zinc and copper, typically in the case of roofs or facades
•Calculation and regulation of water quantities
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Herning - Carpenter and joineryThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Inside and exterior repair and establishment
•Wearing Works
•Wind catches and replacement of doors and windows
•Glass lists
•Stern
•Replacement of roof slabs
•Burglare injuries (e.g., after vandalism)
•Replacement of load-bearing wooden pillars
•Wooden cladding
•Troubleshooting, repair and minor replacement of roof paper/cloth
•New skylights in “flat” roofs
•New roofs with diaphragm other than roofing cardboard
•Moving plaster walls
•Laying and repairing wooden floors
•Ceilings
•Interior doors (both new and repairs)
•Minor rebuilds
•Repair and service after storm and water damage
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Herning — Painting workerThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Miscellaneous repair works — inside and out
•Painting of facade coverings, exterior
•Painting of windows and doors, exterior
•Painting of interior wall surfaces
•Painting of interior ceilings
•Painting of interior woodwork, paintwork
•Painting of windows and doors in facades
•Grinding, oiling/refinishing of wooden floors
•Tissue and wallpapering
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.
Campus Holstebro - EL works, including strong current, weakcurrent and IT cablingThe descriptions below constitute the task of content in the respective fields of expertise where Contracting entities need to experience operational and maintenance tasks. These are exemplification of tasks alone, and thus the list is not exhaustive or binding on Contracting entities.
The primary task of content in this subject area is expected to be as follows:
•Troubleshooting, repairing and replacing existing power installations
•Repair of outdoor lighting
•Moving power installations
•Miscellaneous board repairs
•Repair and replacement of fixtures
•Establishing new installations
•Sockets
•Headboards
•Relays
•Lighting
•Grounding (establishing, inter alia, ground spears)
•Strong current, weakflow and IT cable launches
•Work takes place indoors and outdoors
•The electrician must be able to make energy calcu
•IT installations including cabling and termination of copper and fibre connections
•Acute tasks and call of duty
Three (3) Framework Agreements are expected to be awarded on the Partial Agreement.