Main dimensions of the order:
- Kabinenaußenmaß B x T x H = 430 x 440 x 225 cm
- 1 hydraulic lift - 1,000 kg payload
- throughloaders
- Approx. 3.5 m lifting height
- 2 stops UG + EG
- Outdoor installation
plus maintenance work.
The city of Memmingen, Stadtwerke Memmingen, is planning to build a new combined indoor and outdoor swimming pool as a year-round swimming pool. The entire building is designed and planned as a passive house. All construction structures meet the requirements of a passive house and are made in close coordination with building physics. The new building is to be built on the site of the existing outdoor swimming pool, after demolition of the existing building. The new combined pool includes a 25-meter swimming pool with 8 lanes, a diving board 1 meter / 3 meter, a teaching pool with approx. 12.5 x 10 meters, a course pool with movable floor, a toddler pool, as well as other attractions. In the area of the outdoor pool, a 50-meter pool with 6 lanes, a non-swimmer pool with approx. 500 m² with various attractions and a toddler pool with approx. 100 m² are being built. In addition, a beach volleyball court, a playground and the like, outbuildings with changing rooms, sanitary facilities and a kiosk will be built in the outdoor facilities.
Main dimensions of the order:
- Kabinenaußenmaß B x T x H = 430 x 440 x 225 cm
- 1 hydraulic lift - 1,000 kg payload
- throughloaders
- Approx. 3.5 m lifting height
- 2 stops UG + EG
- Outdoor installation
plus maintenance work.
For further details, please refer to the service description.
Scheduled schedule:
The contract begins with the award of the contract (expected at the beginning of October 2023).
Start of work within 12 working days after receipt of the request by the client (§ 5 paragraph 2 sentence 2 VOB/B). The request is expected to be received by week 12/2024. The service must be completed (ready for acceptance) within 180 working days after the above-mentioned deadline for the start of execution.