1. The subject of the proceedings is the preparation and development of documentation for the project entitled "Modernization of the tram network in Aleksandrowska Street from Szczecińska Street to Bielicowa Street together with the construction of the multimodal node Łódź Żabieniec" in the scope of construction and reconstruction of linear tram infrastructure, planned for co-financing under the financial perspective 2021-2027.
2. The Contracting Authority reserves the right to limit the scope of the contract by resigning from some of the studies specified in Chapter IV, point 3.2. SWZ or Tasks, with the proviso that the minimum scope of services provided by the Contractor will correspond to 60% of the total lump sum remuneration specified in the contract.
3. The Contracting Authority described the subject of the contract in Annex 1 to the SWZ – Description of the subject of the contract with attachments and in Annex 2 to the SWZ – Draft provisions of the contract.
1. The subject of the proceedings is the preparation and development of documentation for the project entitled "Modernization of the tram network in Aleksandrowska Street from Szczecińska Street to Bielicowa Street together with the construction of the multimodal node Łódź Żabieniec" in the scope of construction and reconstruction of linear tram infrastructure, planned for co-financing under the financial perspective 2021-2027, including:
1) functional and utility program,
2) materials necessary to submit a complete application for issuing an environmental decision and obtaining the above-mentioned decision with immediate enforceability,
3) feasibility study,
4) the application form together with all necessary attachments, current as at the date of submission, and with the preparation of relevant explanations and updates during the formal and substantive application evaluation in a manner and time enabling the Contracting Authority to meet the requirements imposed by the Managing Authority.
2. As part of the project, it is assumed to modernize the track in Aleksandrowska Street over the length of approximately 2.8 km from Szczecińska Street (without the intersection and loop) to Bielicowa Street (with the intersection) along with the construction of the multimodal node Łódź Żabieniec.
The documentation should be divided into the following tasks:
Task 1 "Modernization of the tram network in Aleksandrowska Street from Szczecińska Street (without intersection and loop) to Bielicowa Street (with intersection)"
Task 2 "Construction of the multimodal Łódź Żabieniec Junction within the viaduct over the railway line No. 15 and Limanowskiego Street from the viaduct to Woronicza Street"