Federal Ministry of the Interior, Construction and Home
Extension building Moabiter Werder (EMW)
Scaffolding work DIN 18 451 - KKE 307
DIN 18451 scaffolding work
Work and protection scaffolding as length-oriented standing scaffolding system scaffolding on all facades of the building structure.
Installation height up to approx. 52 m in the area of component C (high-rise building)
Installation height up to approx. 6m in the control building area
The scaffolding is installed on different terrain levels (in the control building area, the work and protection scaffolding is mounted on the roof above control buildings). The construction of scaffolding, stair towers and scaffolding cladding is carried out alongside the progress of the structural work.
facade scaffolding area approx. 8,724 m²
Period:
Start: Apr 25, 2022
End: 5/24/2024
Binding individual deadlines