1 500 m
Roofing work consisting of:
Main components of the hall roof, delivery and installation:
- work planning;
- 1 510 m
With edging profile, roof ridge and support made of steel profile
- 4,020 m of trapezoidal full-bead filler made of rock wool, fleece-lined for trapezoidal sheet metal roof;
- 1 510 m
- 1 510 m
- 159 m PUR / PIR insulation on the parapet above;
- 159 m
- 1 510 m
- 159 m parapet cover consisting of PU roof edge plank and titanium zinc sheet, pre-weathered;
- Fall protection system as a rope system for the entire roof;
- Vacuum drainage system for horizontal laying made of hot-dip galvanized steel pipes with stainless steel roof drains for the roof drainage of the hall roof;
- 355 m of pipe insulation and colored sheet steel coating of the steel drainage pipes;
- 8 skylights with RWA technology as ready-to-use systems;
- 1 flat roof window as roof hatch;
Main components of the roof over the ground floor, delivery and installation:
- work planning;
- 850 m
- 538 m
- 538 m
- 787 m
- 192 m parapet cover consisting of PU roof edge plank and titanium zinc sheet, pre-weathered;
- Fall protection system as a cable system for the flat roof above the ground floor;
- Roof drainage as gravity drainage with roof drains and downpipes;
- 1 flat roof window as roof hatch ..