The present tender notice applies to specialist tenders for the realisation of the master plan for the renovation of Søndergården for Bo42 located in Rønne on Bornholm. Søndergården, which was originally built in two departments, has been merged into one department in connection with the approval of the master plan in June 2021. The project concerns a total of 93 homes. The Master Plan includes renovation of structures and installations, merging of apartments and establishment of accessible housing. The project is being tendered with a planned construction start in March 2023 and a construction period of 24 months.
The works are offered in 8 trade contracts:
E1 – Construction site, Soil, terrain, sewer, fasteners, masonry, etc. (A)
E2 – Walls (MU)
E3 - Carpenter, Roof (TØ1)
E4 – Carpenter (TØ2)
E5 – Painter (MA)
E6 – EL (EL)
E7 – VVS (VVS)
E8 – Ventilation (VE)
The project relates to public housing and is being carried out with public support. The task shall be subject to the legislation applicable for such matters, with associated circulars and guides.
E1 – Construction site, Soil, terrain, sewer, fasteners, masonry, etc. (A)Degradation / environmental remediation / removal of waste / cleaning
Building site
Allee Jordarbejder
Allee Terrænarbejder
All Gartneriarbejder
All fastenings (concrete tiles / asphalt)All sewerage works in terrain up to and including
samlebrønd
Closure of ventilation penetrations in
facademur
Walling of wall hole as an exist. Masonry
Tegloverligger
Exterior rep. brick and plinth (incl. grout)
Sole benches (e.g. soft joints replaced, few
males)
E2 – Walls (MU)Degradation / environmental remediation / removal of waste / cleaning
Terrændæk/construction
Afretningslag
Foundation under load-bearing partitions and
steel frame in joint premises
Inner walls of aerated concrete
Interior plaster repairs
Radon protection of off-road tyres
Vådrumssikring
Tiles everything incl.
All kloakarbejder in building up to and including path cladding until the gathering roar
E3 - Carpenter, Roof (TØ1)Degradation / environmental remediation / removal of waste
Section 1
Oplægtning incl. evt. opretning
Tagbeklædning alt incl.
Taghætter alt incl.
skylights
Gable construction incl. cladding
Gavllem
Vindskeder / sternbrædder
Eaves
Gutters and slopes
Replacing insulation in types A and B
Additional insulation in roof spaces
New footbridge
Section 2
Demont. of existing roof caps, closing gaps with new roof tiles;
Taghætter alt incl.
Adjustment of gables (including steel sheets) to
Gavllem
Gavllem
Additional insulation in attics
New footbridge
E4 – Carpenter (TØ2)Degradation / environmental remediation / removal of
wastes
Windows / doors
Tilsætninger og indfatninger
Vinduesplader
Replacement of cylinders both in the lead and final
construction phase (builder lev. cylinders).
Fence
Garden gates
Shed
Steel frame
Træfacade
Inner walls
Walkway and alignment "walls 1st floor"
Floors
Fodlister / gerigter
Rep.af ceilings by stairwell
Fasteinventar
Existing doors are being adapted.
E5 – Painter (MA)Degradation / environmental remediation / removal of waste
Ed. painting of already painted houses;
Udv. malerbehandling af stern vindskeder, embezzlement
Indv. painting of new / remodeled walls;
Indv. paint treatment of existing walls;
Indv. painting of new woodwork;
Indv. painting of old woodwork;
Cleaning
E6 – EL (EL)Decomposition / removal of waste
All electrical works
E7 – VVS (VVS)Degradation / environmental remediation / removal of waste
All plumbing works
E6 – Ventilation (VE)Decomposition / removal of waste
Allee Ventilationsarbejder