definition study of the 4 sites selected in prefeasibility for the creation of a desalination plant in Grande Terre
current studyit is planned to have seawater analyses carried out on the various sites envisaged in order to complete the input data at our disposal.This will allow us to carry out the best comparison between the different sites, in order to define the location of potential water intakes and discharges of brackish water to ensure a good dispersion
Geotechnical studiesthe reconnaissance and geotechnical studies to be undertaken correspond to the standardized geotechnical missions, standard nf p 94-500 of November 2013, following: Preliminary geotechnical study (G1) completed by in-situ investigations
water analysisas part of phase 1, it is planned to have seawater analyses carried out on the various sites envisaged in order to complete the input data at our disposal. This will allow us to make the best comparison between the different sites, in order to define the location of potential water intakes
realization of the environmental inventoryAs part of phase 1, an environmental, terrestrial and marine inventory is planned to study the ecological characteristics of the plots intended for the establishment of drinking plants, but also to study the feasibility of collecting water in coastal boreholes (vertical or radiant wells) on the beaches. will make it possible to make the best comparison between the different sites