The Hufeland Klinikum in Bad Langensalza was built in the early 1990s as an extension to the main building (ancient building)
years built in massive construction and expanded and renovated in several construction phases until 2006. It consists of a ward building (building G) and a functional wing (building H).
Despite regular maintenance and repair work on the technical systems and plant components,
due to the ever shorter frequency of tap water damage, that the entire
Sanitary installation network due to the material and use-related signs of aging and wear
is to be completely renewed. Therefore, a new installation of the entire sewage / water system of the two is planned.
Building parts G and H during ongoing hospital operations.
power
- Addition of approx. 100 installations in existing sub-distributors
- Approx. 17,500 m of cables and wires incl. laying system
- Ca. 100m Kabelbühne
- Approx. 450 pcs. switches and sockets
- approx. 460 pcs. luminaires
- approx. 105 pcs. escape route lights
- approx. 320 pcs. fire bulkheads
- approx. 4 pcs. construction site power distributor
- approx. 400 pcs. installation equipment disassembly
- Dismantling and relocation work approx. 1,500m of cables and wires
- Measurement and testing work incl. documentation
Lightning protection
- Addition of external lightning protection system with approx. 600m safety line incl. flat roof bracket
Low power
- approx. 275 pcs. De-reassembly of nurse call components incl. approx. 500 m pipe network
- Approx. 13,500 m fire alarm pipe network
- Approx. 2,400 m EDP pipeline network
- approx. 95 data sockets
see II.1.4) - Brief description