The school building at Schulstraße 15 is being renovated. The town hall is newly integrated.
The building complex consists of three sections.
Building section A (BA 1) includes basement, ground floor, 1st floor, 2nd floor, attic (not included here)
Building part B (BA 2) (façade height 10m) includes ground floor, 1st floor, 2nd floor, attic (not included here)
Building section C (BA 3) Gymnasium t (THIS ANNOUNCEMENT).
Building section D (BA 3) gymnasium – intermediate building and social wing (not included here)
For the exact scope, please refer to the bill of quantities
This involves the supply and installation of gates for equipment rooms, etc. in the sports hall.