In the course of the renovation of the former Rochlitz hospital into a care centre for the elderly, road construction work is planned in the park for the use of the elderly residents. The paths are laid out as circular paths and are paved with concrete. The existing tree population must be observed and preserved.
Quantities and masses for tender documents for open-air facilities at the Rochlitz geriatric care centre, road construction
Dismantle 20 m curb
Break off 20 m² slab area
Move 1 piece of bollard luminaire
Move 4 metal benches
Clear 650 m² of plant ground cover and topsoil
Apply 130 m³ of topsoil
Loosen 98 m³ of soil, load it
30 m³ fasteners without binding center loosen, load, install
Producing 650 m² of flat surface
Produce 650 m² of 25 cm ballast base course
Produce 650 m² of concrete pavement
Delivering and moving 480 m of grass border concrete
Cutting 200 m of concrete block pavement
7 pcs. Delivering and moving boulders
2 pcs. Adapting concrete shafts
11 pcs Deliver and plant trees
Supplying and transplanting 52 m² of shrubs
1100 m² of lawn sowing from utility lawns and flower meadows
Disposal of all substances that are no longer needed