The subject of the order is: Execution of construction works for the task "Demolition and modernization of buildings not adapted to flood waters on the Bystrzyca stream". Works should be carried out in accordance with the design documentation and technical specification of the performance and acceptance of construction works prepared by Andrzej Zaniat, who runs Design Services "Pro-Zat" 43-360 Bystra, ul. Ogrodowa 35, constituting Annex 2 to the ToR.
Construction works involving the construction of 6 stone rapids and the elimination of one pipe culvert.
Construction works consisting in the construction of 6 stone rapids and the elimination of one pipe culvert. The location of the subject of the contract will be the administrative area of the Bielsko Forest District.
During the execution of the subject of the contract, in addition to the provisions of law. The orderer recommends that the Contractor should be acquainted with the actual state of the area covered by the contract, before carrying out construction works; The Contractor will be obliged to have a policy or other civil liability insurance document for the entire duration of the contract, for an amount not less than the value of the offer. All tasks are located in the area covered by Natura 2000 protection.
The proceedings are conducted in accordance with the rules provided for the so-called "Reverse procedure" referred to in art. 24aa paragraph 1 and 2 Pzp. Pursuant to the aforementioned provisions, the Awarding Entity will first evaluate the offers and then examine whether the contractor, whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings.
Contractor based on art. 25a item 2 Pzp shall submit to the e-mail address indicated by the contracting authority the e-mail address as at the day of submission of the statement in the form of EED signed by the contractor with a qualified electronic signature. The document should be prepared in accordance with the standard form specified in the Commission Implementing Regulation (EU) 2016/7 of 5.1.2016 establishing the standard Single European Order Document (Official Journal of the EU, L series 2016, No. 3, page 16) and in accordance with Chapter 7.1 of the Terms of Reference.