drywall
approx. 18 pcs. mobile scaffolding
approx. 4,250 m² drywall, different requirements
like. 450 m² Vorsatzschalen
like. 270 m² Installationswände
like. 530 m² Schachtwände
ca. 170 m² interior insulation (calcium silicate hydrate)
approx. 1,800 m corner formations and T-connections
approx. 3,700 m wall and ceiling connections
approx. 1,500 pcs. different wall cut-outs for HLS/Elt
ca. 100 St. Reviklappen with different requirements
ca. 300 m² closed suspended ceilings
approx. 1,450 kg of steel components
27 pcs F30 built-in prefabricated windows
div. Brandschutzverkleidungen, Rohrverkleidungen
Sanitary partitions
16 partition wall systems with and without doors
Aluminium glass doors and walls
14 single and double-leaf T30 aluminium glass doors
2 pcs multi-part T30 aluminium glass elements with doors
7 pcs. multi-part fixed glazed T30 aluminium glass elements of different sizes
2 single and double-leaf aluminium glass doors
3 pcs multi-part fixed glazed aluminium glass elements
1 pcs automatic linear sliding door
15 St Obertürschließer
inner doors
85 interior doors made of wood-based materials, single- and double-leaf
6 pcs T30 interior doors made of wood-based materials
40 pcs. T30 steel doors single- and double-leaf
8 all-glass doors
32 St Revisionstüren T90/T30 zweiflüglig
24 St Obentürschließer
see item II.1.4