Lot 3 Facade
3 psch construction site equipment (pro rata for 3 buildings from 1.BA); 635 m window sills, LM anodised, exterior, in aerated concrete walls, projection:165mm; 39 pcs balcony exit, ALU checker plate, projection: approx. 150 mm; 4687 m2 substrate preparation/façade cleaning; 2230 m joint flank rehabilitation, per running metre joint, aerated concrete filling mortar; 2230 m grouting permanently elastic new; 4687 m2 of levelling filler partially, > 10% - < 30% component area; 2313 m Soffit Panel Insulation System (LPS), 25 mm, Polytherm; 4687 m2 of adhesive and reinforcement filler, organic, fitzed; 1642 m2 primer/intermediate coating, structured, silicone resin dispersion; 4090.08 m2 final coating silicone resin paint, medium tint, HBW : 40-69; 2313 m of coating soffits, without structuring; 84 pcs Insert the mounting anchor and screw on the trellis base; 262 m of climbing rope and bracing; 196 pcs Rope crosses climbing system mount; Repair 15 concrete damaged areas (surface balconies) up to 0.01 m²/D=1.0 cm; repair 462 concrete damaged areas (surface balconies) over 0.01 to 0.05 m²; Repair 185 pcs of concrete damage (surface balconies) over 0.05 to 0.10 m²; 492 m2 coating balcony slab tops, epoxy resin, R 10; 1420 m2 of balcony surfaces, primer, walls+balcony balustrades; 48 pcs Exposed and rust removal of corroded reinforcement, 0.00 - 0.50 m/h; 195 pcs reprofiling, 0.01-0.10 m², area; 65 pcs reprofiling, 0.01-0.10 m² edges; 230 m2 surface protection system for fine filling/painting; 49 m2 PMMA coating entrance landings, 2.20 x 0.85 m, R11; 3 pcs support structure for severely damaged, stair supports, KS-MW; 459 pcs chiseling, t= up to 3cm; 399 pcs Reprofiling of the excavation sites, t= up to 3cm,; 94 m2 PMMA coating steps HE staircases, R11; 29.4 m2 treatment risers, stair and landing stringers; 89.3 m2 surface protection risers, stair and landing stringers; 26.5 m2 mosaic flooring, balcony balustrade, accent areas, 1.30 m² each; 3218 m2 of pre-treatment free procedure, balconies; 153 m of repairing concrete damage (edge balconies), 5/5 cm, >10 cm; 1477 m of repairing concrete damage to balcony installations; 873 m Fill joints with sealant, w= up to 35 mm, sand; 1300 m2 of balcony surfaces, primer, walls+balcony balustrades; 1560 m2 of balcony areas, coating, OS DII, accent area emphasized; 97 m2 coating of balcony shafts on the outside, full-surface, HBW >20-39; 526 m2 Filling primer (pore & cavity closure); 26 pcs sheet metal cover of the house entrances/roof, floor area: approx. 2.45x0.6 m; 64.5 m gutter, square, titanium-zinc, Ng 200, d=0.65 mm; 61 m rainwater downpipe, titanium-zinc, house entrance (HE);