Dimensional surveying services | Tenderlake

Dimensional surveying services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 April 2023
Closing Date:
25 May 2023
Location(s):
DEB11 Koblenz, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
BWaStr precision levelling 2023 on the Mittelland Canal (MLK), several branch and connecting canals as well as on the Weser, Lower Weser, Hunte, MLK, Lesum, Hamme and Wümme

Execution of precision levelling in the height network of the Federal Waterways and Shipping Administration in the following areas:

Lot 1:

- Mitteland Canal, left and right bank, canal kilometers approx. 0 to 175

- Ibbenbüren branch canal (SKI), left and right bank, canal kilometres approx. 0 to 1

- Osnabrück branch canal (SKO), left and right bank, canal kilometers approx. 0 to 11

- Branch canal Hannover-Linden (SKL), left and right bank, canal kilometers approx. 0 to 10

- Connecting Canal North (VKN), left and right bank, canal kilometers approx. 0 to 1

- Connecting Canal South (VKS), left and right bank, canal kilometers approx. 0 to 2

- Connecting canal to the Leine (VKL), left and right bank, canal kilometers approx. 0 to 2

- Dortmund-Ems Canal (DEK), left bank, canal kilometers approx. 106 to 110

- Weser (We), left and right bank, river kilometers approx. 204 to 206

- Leine (Le), left and right bank, river kilometer approx. 227

Lot 2:

- Weser, left and right bank, river kilometres approx. 203 to 367 including the lock canals Drakenburg, Dörverden, Landesbergen, Langwedel, Petershagen and Schlüsselberg

- Lower Weser, left and right bank, river kilometers approx. 0 to 69

- Hunte, left and right bank, river kilometers approx. 0 to 25

- Mittelland Canal (MLK), left and right bank, canal kilometer approx. 102

- Lesum, left and right bank, river kilometers approx. 0 to 7

- Hamme (Weser), right bank, river kilometer approx. 17 to 28

- Wümme, left bank, river kilometers approx. 0 to 18

BWaStr precision levelling on the Mittelland Canal (MLK) as well as several branch and connecting channels

Execution of precision levelling in the height network of the Federal Waterways and Shipping Administration in the following areas:

- Mitteland Canal, left and right bank, canal kilometers approx. 0 to 175

- Ibbenbüren branch canal (SKI), left and right bank, canal kilometres approx. 0 to 1

- Osnabrück branch canal (SKO), left and right bank, canal kilometers approx. 0 to 11

- Branch canal Hannover-Linden (SKL), left and right bank, canal kilometers approx. 0 to 10

- Connecting Canal North (VKN), left and right bank, canal kilometers approx. 0 to 1

- Connecting Canal South (VKS), left and right bank, canal kilometers approx. 0 to 2

- Connecting canal to the Leine (VKL), left and right bank, canal kilometers approx. 0 to 2

- Dortmund-Ems Canal (DEK), left bank, canal kilometers approx. 106 to 110

- Weser (We), left and right bank, river kilometers approx. 204 to 206

- Leine (Le), left and right bank, river kilometer approx. 227

The precision levelling and the associated measuring equipment must be adapted to the accuracy requirements (1st order, standard deviation SS for one kilometre double levelling ≤ 0.4 mm/km, permissible distance contradiction: ZS=0.5*S+-1.5*SQRT(S) taking into account local conditions. At least two measurement teams must be deployed daily for the levelling. In addition, a reserve measurement team must still be available for leveling.

For height transmission with large and different target distances, classic current transition levels must also be observed. Corresponding special equipment from Zeiss can be provided free of charge by the Federal Institute of Hydrology (BfG).

There is no marketing work. The further processing of the levelling data as well as the calculation of the final heights is carried out by the client.

Measurement sketches, some photo sketches and point lists will only be provided after commissioning.

Please refer to the tender documents for a detailed description of the services to be provided.

BWaStr precision levelling on the Weser, Lower Weser, Hunte, MLK, Lesum, Hamme and Wümme

Execution of precision levelling in the height network of the Federal Waterways and Shipping Administration in the following areas:

- Weser, left and right bank, river kilometres approx. 203 to 367 including the lock canals Drakenburg, Dörverden, Landesbergen, Langwedel, Petershagen and Schlüsselberg

- Lower Weser, left and right bank, river kilometers approx. 0 to 69

- Hunte, left and right bank, river kilometers approx. 0 to 25

- Mittelland Canal (MLK), left and right bank, canal kilometer approx. 102

- Lesum, left and right bank, river kilometers approx. 0 to 7

- Hamme (Weser), right bank, river kilometer approx. 17 to 28

- Wümme, left bank, river kilometers approx. 0 to 18

The precision levelling and the associated measuring equipment must be adapted to the accuracy requirements (1st order, standard deviation SS for one kilometre double levelling ≤ 0.4 mm/km, permissible distance contradiction: ZS=0.5*S+-1.5*SQRT(S) taking into account local conditions. At least two measurement teams must be deployed daily for the levelling. In addition, a reserve measurement team must still be available for leveling.

For height transmission with large and different target distances, classic current transition levels must also be observed. Corresponding special equipment from Zeiss can be provided free of charge by the Federal Institute of Hydrology (BfG).

There is no marketing work. The further processing of the levelling data as well as the calculation of the final heights is carried out by the client.

Calibration sketches, some photo sketches and point lists are only provided after commissioning.

Please refer to the tender documents for a detailed description of the services to be provided.

Download full details as .pdf
The Buyer:
Bundesanstalt für Gewässerkunde
CPV Code(s):
71353200 - Dimensional surveying services