Road construction.
Lot 1: transport systems / road drainage system / lighting system
- 8 800 m
- 7 500 ... m
- 4 800 ... m on-board installation work,
- 6 500 ... m
- 1 400 ... m sewer drainage works rain drainage DN 150 - DN 500,
- 3 ...... pc. Rainwater treatment systems,
- 3 500 ... m
- 5 new construction of bus stops,
- 1 350 m ... new street lighting system,
- 1 500 m of marking work.
Lot 2: bicycle traffic facility / bicycle traffic bridge
- 1 foot and bike path bridge,
- 500 ... m of new construction of a cycle path.
Lot 3: engineering structures
- 1 road bridge,
- 1 retaining wall.
Lot 4: waste water drainage systems
- 300 m sewage pipe DN 150 - DN 300,
- 1 200 m sewage pressure pipeline DN 50 - DN 100,
- 3 conversion / new construction of sewage pumping stations,
- 1,500 m shutdown of the SW channel.
Lot 5. Media supply gas, electrical, telecommunications
- 550 m gas supply lines d 32 - d 160,
- 1 450 m electrical supply lines 1 KV,
- 3,900 m of telecommunication lines.
Dismantling / decommissioning of existing lines
Piercing of the embankment, laying of protective pipes
Lot 6: media supply for drinking water
- 1 450 m drinking water supply line d 125-180 including HA bindings.
Dismantling / decommissioning of existing lines.