Civil engineering, construction and renovation work, repair of the lintel girders, gallery windows, sea wall.
Repair of 15 lintel girders of the gallery windows in the sea wall including natural stone and metal construction work; Length of the bank wall in the processing area approx. 80 m
Construction and dismantling special scaffolding construction as a water-side suspended scaffolding including ballasted supporting scaffolding, scaffolding area (view) approx. 350 m
Renovation of 15 slanted ceiling soffits on the station side (concrete, plastering and painting work)
Processing scope approx. 125 m
Natural stone work: Dismantling and reconstruction of the natural stone cover and water-side natural stone cladding in the lintel level including procurement and packaging of replacement material (Rhenish basalt lava)
Metal construction work: Dismantling and reconstruction of the bank railing including reworking and renewal of the corrosion protection.